← All Success Stories
🧴
Case Study

Injection Moulding

High-mix moulder with hundreds of tools faced long setup times, unplanned tool maintenance and constant firefighting between orders competing for the same machines and moulds.

Get a Similar Solution

The MSF Solution

✔ APS scheduling machines and moulds together as dual constraints
✔ Maintenance module tracking shots per tool with predictive alerts
✔ MES panels at every press for live cycle and scrap monitoring

Results

-30%Setup time
-45%Tool breakdowns
+18%Press utilization
-25%Lead time

Spremni da vidite potencijal svoje fabrike?

Dobijte besplatan demo i PoC plan po meri.

Zatražite demo