IT and Operations often agree an ERP-to-shop-floor connection is needed and disagree on where to start. This blueprint takes your ERP name/version, available interfaces and current manual steps, and returns one concrete, non-confidential first flow — work order to production confirmation, or whatever your actual gap is — with the objects, prerequisites and risks named.
Map my integration blueprintSee all Proof of Concept programsFor an IT and Operations team that knows ERP and the shop floor are disconnected but has not agreed on the first safe flow to connect, or the sequence of prerequisites that makes it low-risk.
This blueprint is conceptual and non-confidential by design — no ERP schema, credentials or production database export is requested or reviewed here. The actual integration is built and validated in the ERP Integration PoC, against a test environment, not this assessment.
No. This is a conceptual exercise based on what you describe — ERP name/version, interfaces, current process — with no system access, credentials or confidential data involved at any point.
It depends on your actual gap — often work-order release from ERP to the floor and production confirmation back, since that pair usually has the most manual re-entry and the clearest ROI. The blueprint names the specific flow for your situation, not a generic one.
No — it is the planning step before it. The PoC builds and validates the actual integration against a test ERP environment; this blueprint defines what that PoC should build first.
Tell us the scope you have in mind and we will come back with a written PoC plan: what gets connected, what you provide, how success is measured and what the decision at the end looks like.