One ERP, one test environment, one complete business transaction loop — work order down, confirmation, material consumption and goods receipt back — with the field mapping approved, the exceptions catalogued and the numbers reconciled. Production data is never touched.
Design my ERP integration PoCTalk to a manufacturing engineerPrimary buyer: Manufacturing IT · ERP Manager · Digital Transformation Manager · Plant Manager · Operations Director
Durations are typical, not guaranteed. What extends a schedule: missing or incomplete data, security and network approvals, hardware lead times, sample collection, installation access, the production schedule, ERP test access, and the time your team needs to review results.
No unplanned shutdown is expected. Any installation window or controlled interruption is agreed with you in advance and scheduled around production.
| Metric | How it is defined | Where the number comes from | Type |
|---|---|---|---|
| Field completeness | Share of agreed fields transferred correctly and completely in both directions. | Your ERP or existing system | Technical |
| Transaction success rate | Share of test transactions completing without manual intervention, across the full test order set. | MSF platform data | Technical |
| Synchronisation latency | Time from an event in one system to it being visible in the other, at the 95th percentile. | MSF platform data | Technical |
| Duplicate prevention | Duplicates created under repeated sends, timeouts and reconnections — the target is zero and it is tested deliberately. | Your ERP or existing system | Technical |
| Reconciliation accuracy | Difference in quantities and statuses between the two systems after the test period. | Your ERP or existing system | Technical |
| Exception visibility | Share of failures that surface with enough detail — step, object, identifier — for support to act without a developer. | MSF platform data | Operational |
| Manual entry removed | Transactions per week that no longer need to be typed into a second system. | Observation and user interview | Financial |
Before implementation, MSF and your team agree how each metric is calculated, where the baseline comes from, what data is excluded, and what result supports a rollout decision. This page lists what gets measured; the actual targets belong in the written PoC scope, not in a marketing claim.
Commercial terms, hardware ownership, travel, integration scope and any rollout credit are defined in the written PoC proposal. They are not the same for every product, and this page does not promise them.
This page and its form never ask for credentials, tokens, database exports or confidential ERP payloads. Access is arranged directly with your IT organisation, through their own channel, after the scope is agreed.
The approach is interface-led rather than vendor-led: whatever documented API, web service, IDoc, database view or file interface your ERP exposes and your IT approves. The readiness step confirms the specific method for your version before any build work starts.
No. The PoC runs against a test or sandbox environment by design. Production connection belongs to the rollout, after the mapping is approved and the cutover plan exists.
Interface documentation, a test endpoint, the authentication method, and an expert available for questions during the mapping phase. The single biggest schedule risk is not technical — it is waiting for a security approval nobody started early enough.
Because duplicates are what actually go wrong in production integrations, usually months later, after a timeout during a network hiccup. Sending the same transaction repeatedly and interrupting it mid-flight is the only way to prove the loop is safe.
Tell us the scope you have in mind and we will come back with a written PoC plan: what gets connected, what you provide, how success is measured and what the decision at the end looks like.