MRP Proof of Concept

Prove Material Availability Before Production Starts

Real BOMs, real inventory, real open supply. The PoC runs the material plan for a controlled product family, compares it line by line against your current ERP or MRP result, and shows how much earlier a shortage becomes visible — and where the differences come from.

Check my material planning PoCTalk to a manufacturing engineer
Typical duration4–6 weeks
Pilot scopeSelected product families, real BOM and routing data, one horizon
Primary buyerMaterial Planner
Decision at the endException workflow, integration design and rollout scope

Is this the problem you need to solve?

  • Production starts and a component is missing that the plan said was available.
  • Planners re-check the MRP output by hand because they have been burned by it.
  • Planned orders churn every run, so nobody can act on them with confidence.
  • BOM and lead-time errors are only found when they have already caused a shortage.

Primary buyer: Material Planner · Production Planning Manager · Procurement Manager · Supply Chain Manager · ERP Manager

What this PoC will prove

Does the material plan agree with your current ERP or MRP result, and where it differs, why?
How many days earlier are real shortages detected for the scoped families?
Which BOM, lead-time or lot-size records are wrong enough to cause a missed part?
Are planned orders stable enough between runs for a buyer to act on them?
How much manual re-checking can the planner honestly stop doing?

Recommended pilot scope

  • Selected product families with real, current BOM and routing data.
  • One planning horizon that includes a genuine supply constraint.
  • Current inventory, open purchase and production orders and reservations.
  • Real lead times, lot-sizing rules, scrap and yield factors and calendars.
  • The output of your current MRP run for the same period, as the reconciliation baseline.

What will be live during the PoC

Net requirement calculation across the scoped families and horizon.
Shortage and excess exception lists with the driving demand behind each.
Planned order proposals with their stability between consecutive runs.
A reconciliation view against your current MRP result, difference by difference.

How this PoC runs

Week 1
Discovery and decision definitionAgree the product families, the horizon, the reconciliation method against your current run and the decision this PoC has to support.Exit gate: Scope and reconciliation method agreed with the planner.
Week 1–2
Site, process and data readinessLoad BOMs, routings, inventory, safety stocks, lead times, lot-sizing rules, open supply and reservations; report master-data exceptions as they surface.Exit gate: Master data validated well enough to run a meaningful plan.
Week 2–3
ConfigurationConfigure planning parameters and run the material plan for the horizon, then reconcile it line by line against your current MRP output.Exit gate: Every material difference against the current run is explained, not averaged away.
Week 3–5
Parallel run or simulationRun consecutive planning cycles with real demand changes to measure planned-order stability and shortage detection lead time.Exit gate: Stability and detection results recorded across several cycles.
Week 5–6
Rollout decision and business casePresent the material plan, shortage and excess report, data-quality findings, exception workflow and ERP integration design.Exit gate: Go, adjust or stop.

Durations are typical, not guaranteed. What extends a schedule: missing or incomplete data, security and network approvals, hardware lead times, sample collection, installation access, the production schedule, ERP test access, and the time your team needs to review results.

No unplanned shutdown is expected. Any installation window or controlled interruption is agreed with you in advance and scheduled around production.

How success will be measured

How success will be measured
MetricHow it is definedWhere the number comes fromType
Shortage detection lead timeDays between the plan first flagging a shortage and the date your team actually discovered it.Agreed baseline measurementOperational
Missing-part riskNumber of scoped orders at risk of a missing component within the horizon, with the driving material named.MSF platform dataOperational
Excess proposalsValue of purchase proposals the plan generates beyond horizon demand, versus the current run.MSF platform dataFinancial
Planned order stabilityShare of planned orders that survive the next planning cycle unchanged in quantity and date.MSF platform dataTechnical
Manual planner effortHours per cycle spent re-checking and correcting the material plan by hand.Observation and user interviewOperational
BOM and data exceptionsCount and severity of master-data errors found, classified by whether they would cause a real shortage.Your ERP or existing systemTechnical
Reconciliation agreementShare of materials where the MSF result matches your current MRP result, with every difference explained.Your ERP or existing systemTechnical

Before implementation, MSF and your team agree how each metric is calculated, where the baseline comes from, what data is excluded, and what result supports a rollout decision. This page lists what gets measured; the actual targets belong in the written PoC scope, not in a marketing claim.

What you need to provide

  • BOMs, routings and the product families you want covered.
  • Inventory, safety stocks, lead times, lot-sizing rules and calendars.
  • Open purchase orders, production orders and reservations.
  • Scrap and yield factors, plus your current MRP output for the same horizon.

Who does what

Meta Smart Factory provides

  • Discovery workshop and scope facilitation
  • Solution configuration for the agreed scope
  • Integration and connection work inside that scope
  • MSF hardware listed in the proposal
  • Training for the pilot users
  • The KPI definitions and validation method
  • Issue tracking and support during the pilot
  • The final result report and rollout design
  • A line-by-line reconciliation against your existing MRP result, with each difference explained.
  • A prioritised master-data exception list — the records that actually cause missed parts.

You provide

  • A named business owner and a named technical owner
  • Timely access to users, the line, machines and approved systems
  • An accurate explanation of the process and the master data
  • Network, power, mounting and safety access
  • ERP, PLC and vendor documentation, plus the experts who know them
  • Representative samples or historical data
  • Validation that the baseline is fair
  • Feedback and the acceptance decision
  • A planner who can confirm which differences are MSF being right and which are MSF being wrong.
  • Access to the current MRP output for the same period and parameters.

Defined in the written proposal

  • Panel PCs, tablets, servers and GPU servers
  • Cameras, lenses, lighting and enclosures
  • Scanners, printers, RFID readers, meters and sensors
  • Travel, installation, freight, import duty and local electrical work
  • Whether hardware is rented or purchased
  • Whether any PoC fee is credited against a rollout

Commercial terms, hardware ownership, travel, integration scope and any rollout credit are defined in the written PoC proposal. They are not the same for every product, and this page does not promise them.

What you receive at the end

  • A material plan for the scoped families over the agreed horizon.
  • Shortage and excess report with the demand driving each line.
  • Data-quality findings ranked by real shortage risk.
  • Proposed exception workflow — who acts on what, and when.
  • ERP integration design for a production rollout.
  • Rollout recommendation and the scope of the first release.

Dependencies, exclusions and limits

This PoC depends on

  • BOM and lead-time data being current for the scoped families.
  • Access to your current MRP output for the same horizon and parameters.

Not included in this PoC

  • Finite-capacity sequencing on machines, which is the APS PoC.
  • Purchase order execution and supplier portal integration.
What this PoC does not claim

MRP output is only as good as the master data behind it. Where BOMs, lead times or lot sizes are wrong, this PoC reports it as a finding — it does not silently correct your data and then present the corrected result as a software improvement.

Go, adjust or stop — the decision gate

GoGo: the plan reconciles, detects shortages earlier and is stable enough to act on — proceed to integration.
AdjustAdjust: master data must be corrected first; the exception list is the work package and its size is now known.
StopStop: your current MRP already performs at this level for these families, and the effort belongs elsewhere.

Frequently asked questions

Does this replace our ERP’s MRP?

Not necessarily, and the PoC does not assume it should. It shows where the two results differ and why. Sometimes the answer is that your ERP is fine and the real gap is data quality or exception handling — that is a legitimate and useful outcome.

How long does it take if our BOMs are messy?

The readiness step usually finds this within the first two weeks, and it becomes the headline finding. The plan is still run and still reconciled, but the honest deliverable becomes a prioritised data-cleanup work package with the shortage risk attached to each item.

Why measure planned-order stability?

Because a plan that changes every run is a plan buyers learn to ignore. Stability across consecutive cycles is what makes the output actionable, and it is measured here rather than assumed.

Can this run together with the APS PoC?

Yes, and they share data. MRP answers whether material will be there; APS answers whether capacity will. Run together they need one combined scope and a longer schedule than either alone.

Request this Proof of Concept

Tell us the scope you have in mind and we will come back with a written PoC plan: what gets connected, what you provide, how success is measured and what the decision at the end looks like.

Please do not send credentials, production database exports, employee records or confidential drawings through this form. If a PoC needs them, we set up an approved secure channel first.

Submissions are checked for abuse and logged, including IP address. You are responsible for what you submit.