Real BOMs, real inventory, real open supply. The PoC runs the material plan for a controlled product family, compares it line by line against your current ERP or MRP result, and shows how much earlier a shortage becomes visible — and where the differences come from.
Check my material planning PoCTalk to a manufacturing engineerPrimary buyer: Material Planner · Production Planning Manager · Procurement Manager · Supply Chain Manager · ERP Manager
Durations are typical, not guaranteed. What extends a schedule: missing or incomplete data, security and network approvals, hardware lead times, sample collection, installation access, the production schedule, ERP test access, and the time your team needs to review results.
No unplanned shutdown is expected. Any installation window or controlled interruption is agreed with you in advance and scheduled around production.
| Metric | How it is defined | Where the number comes from | Type |
|---|---|---|---|
| Shortage detection lead time | Days between the plan first flagging a shortage and the date your team actually discovered it. | Agreed baseline measurement | Operational |
| Missing-part risk | Number of scoped orders at risk of a missing component within the horizon, with the driving material named. | MSF platform data | Operational |
| Excess proposals | Value of purchase proposals the plan generates beyond horizon demand, versus the current run. | MSF platform data | Financial |
| Planned order stability | Share of planned orders that survive the next planning cycle unchanged in quantity and date. | MSF platform data | Technical |
| Manual planner effort | Hours per cycle spent re-checking and correcting the material plan by hand. | Observation and user interview | Operational |
| BOM and data exceptions | Count and severity of master-data errors found, classified by whether they would cause a real shortage. | Your ERP or existing system | Technical |
| Reconciliation agreement | Share of materials where the MSF result matches your current MRP result, with every difference explained. | Your ERP or existing system | Technical |
Before implementation, MSF and your team agree how each metric is calculated, where the baseline comes from, what data is excluded, and what result supports a rollout decision. This page lists what gets measured; the actual targets belong in the written PoC scope, not in a marketing claim.
Commercial terms, hardware ownership, travel, integration scope and any rollout credit are defined in the written PoC proposal. They are not the same for every product, and this page does not promise them.
MRP output is only as good as the master data behind it. Where BOMs, lead times or lot sizes are wrong, this PoC reports it as a finding — it does not silently correct your data and then present the corrected result as a software improvement.
Not necessarily, and the PoC does not assume it should. It shows where the two results differ and why. Sometimes the answer is that your ERP is fine and the real gap is data quality or exception handling — that is a legitimate and useful outcome.
The readiness step usually finds this within the first two weeks, and it becomes the headline finding. The plan is still run and still reconciled, but the honest deliverable becomes a prioritised data-cleanup work package with the shortage risk attached to each item.
Because a plan that changes every run is a plan buyers learn to ignore. Stability across consecutive cycles is what makes the output actionable, and it is measured here rather than assumed.
Yes, and they share data. MRP answers whether material will be there; APS answers whether capacity will. Run together they need one combined scope and a longer schedule than either alone.
Tell us the scope you have in mind and we will come back with a written PoC plan: what gets connected, what you provide, how success is measured and what the decision at the end looks like.