CBAM has been in its definitive period since 1 January 2026. The EU importer files the declaration, but the emissions figure has to come from the plant that made the goods, and exporters in Türkiye, Serbia and the rest of the region are being asked for it product by product.

CBAM, the EU's carbon border adjustment mechanism, entered its definitive period on 1 January 2026. It covers imports of iron and steel, aluminium, cement, fertilisers, electricity and hydrogen. The legal duty sits with the EU importer, who declares the emissions embedded in the goods. The figure itself has to come from the producer, and when the producer cannot supply a verified one, the importer falls back on default values. For exporters in Türkiye, Serbia, Bosnia and Herzegovina, North Macedonia, Montenegro and Albania, that makes emissions per product part of the commercial conversation.

What the buyer is asking for

The first annual CBAM declaration, covering imports made in 2026, is due by 30 September 2027. Importers are already collecting data from their suppliers for it: emissions per product, the method used to calculate them, and the installation where the goods were made.

Embedded emissions are calculated per installation and production process and then attributed to the goods that process made. In practice the plant needs its fuel, electricity and material quantities per process, and the output of each process over the same period. A plant that only has monthly utility bills and a yearly production total can produce an average and little more.

Türkiye: the ETS pilot has started

Türkiye published its emissions trading regulation on 27 August 2026. The pilot covers 2026 and 2027 and applies to electricity generation, cement, iron and steel, aluminium and fertilisers. 2026 is a reporting year. The obligation to surrender allowances starts with 2027 emissions, and in the pilot those allowances are allocated free of charge. The first monitoring plans were originally due within two months of the regulation, and the deadline was later extended to January 2027. Verified emission reports for 2026 are due by 30 April 2027. For many Turkish steel and aluminium exporters, the same measurements now serve two purposes: the national ETS and the data their EU customers request under CBAM, known in Türkiye as SKDM.

Serbia and its neighbours

From 1 January 2026, Serbia taxes greenhouse gas emissions above a reference level from fertiliser, cement, iron and steel, aluminium and power installations at 4 euros per tonne, and it taxes the emissions embedded in carbon-intensive imports at the same rate. Importers that bring in less than 5 tonnes of such goods a year are exempt. According to Serbian media reports, EU buyers now ask Serbian exporters for emissions data per product. In Bosnia and Herzegovina, the IMF estimates that about a tenth of exports fall within CBAM's scope.

Where the plant data comes from

Electricity is a good place to start, because it can be metered per machine. The MSF Energy Module records power and energy per machine and workstation in real time and, through the MES, attributes the measured energy to whichever order was running at that moment. That gives energy per work order and per product from measurement, with no estimate from industry averages. Energy between orders, such as idle running and warm-up, is allocated by a rule the plant chooses.

Older panels can be metered without a shutdown of the whole plant. Split-core current transformers fit around existing conductors, and MSF IIoT energy analyzers go in panel by panel, a few hours per metering point. Meters already installed are read over Modbus or MQTT and kept.

Fuels, process emissions and materials need their own measurements, and they depend on the process: a furnace and a press line are metered differently. What the MES adds is the production side of the equation: how much of which product was made, in which order, on which line and in which period. With production traceability, each batch also keeps its material lots, so emissions can follow the product rather than the month.

What software does not replace

A CBAM figure is calculated with the methodology the regulation sets, and a verified figure needs an accredited verifier. Plant software supplies measured inputs and keeps them tied to orders and batches, which is what makes a calculation checkable. The legal interpretation and the verification stay with the specialists who do that work.

The same machine-level measurements also feed ISO 50001 records and product carbon footprints. The same data shows the plant its own energy cost per product, which is useful whether or not a buyer asks for it.

Discuss This With Our Experts

Frequently Asked Questions

Who has to report under CBAM, the exporter or the importer?

The EU importer files the CBAM declaration. The producer outside the EU supplies the emissions data per product and the method behind it, and without verified data the importer has to use default values.

How can a factory measure energy per product?

By metering electricity per machine or panel and joining those readings with the MES record of which order was running at each moment. The measured energy is then attributed to work orders and products, with idle and warm-up energy allocated by a chosen rule.