Every product PoC on this site is deliberately scoped to one representative site — proving a program company-wide at every plant simultaneously is not how any of them are built to run. This assessment is for the enterprise question underneath that: which plant should go first, what should be standardized globally versus decided locally, and what a staged rollout across the group actually looks like.
Plan our multi-plant standardizationSee all Proof of Concept programsFor an operations director or digital-transformation lead responsible for multiple plants with different systems, KPIs and process maturity — who needs a sequencing plan, not a single-plant pilot scope.
This assessment does not commit the group to a single platform or a fixed rollout date — it produces a sequencing recommendation. Every plant that follows still runs its own scoped PoC against its own systems and data; nothing here substitutes for that.
Not recommended, and not how any program on this site is scoped. A single reference plant produces a clean, defensible result faster; that result — including the rollout architecture — is what the following plants build on.
Common, and part of what this assessment maps directly — the integration inventory records exactly that, and the staged rollout approach accounts for it rather than assuming one ERP everywhere.
Someone with visibility across plants — an operations director, digital-transformation lead or group IT/OT manager — since the questions are about standardization and sequencing across sites, not single-plant operational detail.
Tell us the scope you have in mind and we will come back with a written PoC plan: what gets connected, what you provide, how success is measured and what the decision at the end looks like.