MOM is the layer between the ERP and the machines: everything that decides what is made, on which machine, from which material, by whom and at what quality. Meta Smart Factory covers that layer with modules that share one data model, so a plant can start with one and add the next without a new integration project.
Talk to us about your plantIn ISA-95, the international standard for connecting enterprise and control systems, level 3 is manufacturing operations management. It sits between business planning (ERP, working in days and weeks) and control (PLC and SCADA, working in milliseconds), and it works in minutes and hours. MES is the best known part of it. MOM is the wider term, because the same level also holds scheduling, material handling, quality and maintenance.
The standard describes four kinds of operations at this level. Meta Smart Factory has a module for each.
Plants that buy these functions from separate vendors end up with a reconciliation job in the middle. A useful test: which system holds the work order, and which holds material genealogy? If one system holds both, the integration tends to hold. If they are different systems, someone has to say who reconciles them. Here the MES, APS, WMS, quality and maintenance modules read the same machine events, so a stop recorded once reaches the schedule, the maintenance plan and the ERP confirmation.
The platform does not ask you to replace what already works. SCADA stays at the control level and the ERP stays the business system, with standard connectors for SAP, Microsoft Dynamics, Oracle NetSuite and Odoo. MES vs ERP vs SCADA sets out where each system ends.
MES is the part of MOM that executes and records production on the floor. MOM is the wider category that adds scheduling, inventory, quality and maintenance operations at the same level. Many vendors use the two terms for the same product, so ask which functions are actually implemented.
Between them. ERP decides what to make and buy and works in days and weeks. SCADA and the PLCs run the machine in real time. MOM holds the context neither has: the work order, the material lot, the operator and the quality result behind each count.
No. Start with one module against one named problem, usually machine data and MES on a bottleneck line, and add the next once the first is used every shift.
Yes. Orders, items, BOMs and routings come down from the ERP, and confirmations, material consumption and scrap go back. The first phase is read-only.
The digitalization assessment scores nine areas and points to your three biggest gaps. Any module can then be tried in a Proof of Concept on your own data.