Not a slide-deck demo. We load your actual open orders, work centers, changeover matrix and capacity constraints into MSF APS and run it alongside the plan your planner already produced for the same week. Then we compare both against the same measures.
Start the APS vs Excel challengeSee all Proof of Concept programsFor a planning team that is not sure a planning tool would beat what an experienced planner already does in Excel, or whose memory of a past planning-software attempt is that it produced a plan nobody trusted. This challenge answers that question with your own data.
This challenge does not declare a winner before the data is in. A well-run manual plan can beat a poorly-configured automated one, and the comparison is built to show that honestly. It does not guarantee a result in APS's favor.
No. This challenge runs entirely on planning data (orders, routings, constraints), with no machine or MES connection required. That is what the APS PoC itself is for, once planning is proven.
Typically one to two weeks: a few days to load and validate your data, then the parallel run against the same period your planner is already working.
That is a real, useful outcome. The comparison is measured, with no conclusion fixed in advance. If the manual plan wins on a specific measure, that becomes part of what the APS PoC scope is built to address.
Tell us the scope you have in mind and we will come back with a written PoC plan: what gets connected, what you provide, how success is measured and what the decision at the end looks like.